Direct operations plus upstream and downstream. Suppliers and subcontractors are scored on their own locations rather than on a questionnaire, EUDR materials are traced to the plot, and the requirements your customers push down the chain are carried into the same plan.
In scope
The three stages, in the words CDP and the ESRS use
Rating agencies and regulators no longer accept an assessment that stops at the factory gate. Every risk we score carries the value chain stage where it happens.
- Direct operations — everything in the Direct Operations scope, unchanged
- Upstream — suppliers and subcontractors scored on their own sites, weighted by criticality, annual spend and single-sourcing
- Upstream — EUDR materials traced: plot geolocation, legality, due diligence statements, deforestation risk by country of origin
- Downstream — products and customers exposed to transition risk and to buyer requirements, including the supplier programmes of large accounts
- Downstream — transport, distribution and end of life where they carry the exposure
- Supplier actions costed and scheduled like your own: questionnaires, dual sourcing, contract clauses, adaptation co-investment at the single-source supplier
How it runs
Four steps, and a consultant at the end of each one
- Direct operations first
The site assessment runs exactly as in the Direct Operations scope. It is the baseline the rest is measured against. - Supplier and product mapping
Two more structured forms: subcontractors and suppliers, then materials and products. Addresses are geocoded, HS codes and volumes attached, countries of origin resolved. - Upstream and downstream scoring
Each supplier location is scored on the same eight categories. Criticality, spend and single-sourcing set the weight it carries in your own exposure. - One consolidated plan
Site actions and supplier actions land in the same action plan, with the same budgets, owners and dates — not in a separate procurement annex nobody reads.
Continuity case
A continuity break that starts at your supplier
The same discipline applied upstream, where most continuity breaks actually start — at a supplier you did not score because a questionnaire told you it was fine.
The break does not start at your gate. A single-sourced supplier loses its own water allocation or its own site to a flood; its output stops, and two weeks later your line stops with it. A questionnaire would have told you the supplier has a policy. Scoring its actual location tells you the hazard it sits in, and the weighting tells you how much of your exposure travels through it.
| Item | Value | Where it comes from |
|---|---|---|
| Supplier score | Computed on the supplier’s own sites, eight categories | Same engine, same datasets — not a declaration |
| Weight in your exposure | Criticality × annual spend × single-source flag | Declared by you, applied to the supplier’s score |
| Propagated downtime | Supplier stoppage carried into your own business interruption | Same downtime scale, applied upstream |
| Contractual exposure | Penalties, de-listing, cost of emergency re-sourcing | Costed in the action plan, with FOU-02 and FOU-04 |
| Insurance | Contingent business interruption — only covered if the supplier is named | The supplier list with its locations and scores, which is what the policy needs |
| ESRS | 2 SBM-3 · E1-9 · S2 · E3-5 | Upstream value chain, anticipated financial effects, workers in the chain |
| CDP | 3.1.1 · 5.11 · supply chain module | Risk register, value chain engagement, supplier response |
Upstream figures are orders of magnitude built from the supplier’s location and your declared spend, not from the supplier’s accounts.
Compliance tables
The compliance tables you actually reuse
Annexes A to I are delivered in Excel, Word, PDF and an HTML explorer. They are the part clients come back to: not the narrative, the tables. Each one is produced from the data the assessment already holds, so nothing is retyped and every cell keeps its source.
| Annex | Table | What is in it |
|---|---|---|
| A | World inventory of labels, certifications, standards, ratings and regulations | 147 instruments, 19 columns each — issuing body, jurisdictions, thresholds, deadlines, procedure, validity, official source, verification date, confidence and limits |
| B | Schemes by company and site | What applies to each entity and each location, split between held and verified, declared, relevant to examine, and recommended — with the justification and the missing data named |
| C | Risks / scenarios / trajectories / schemes matrix | Every risk crossed with the scenario, the trajectory and the instrument it feeds — this is the table that turns an assessment into a questionnaire answer |
| D | Verbatims and documentary evidence | Exact excerpts with their source and date; model excerpts and demo texts are labelled as such |
| E | Gap analysis | Requirement by requirement: evidence available, declared but unverified, planned, or open |
| F | Prioritisation matrix | Effect over cost, with a no-regret bonus, so the order of work is argued rather than asserted |
| G | Trajectories, targets and indicators | The baseline, the target, the pathway and the indicator that proves it moved |
| H | Register of sources and assumptions | Every value with where it came from, when, and what was assumed — the annex auditors open first |
| I | Consolidated action plan | One line per action: budget, owner, date, ISO clause, CDP question, residual risk |
Applicability is shown as likely and confirmed with you — it is never asserted for every entity. Obligations are kept apart from voluntary schemes, and no certification is said to reduce a risk: the mapping states what the scheme structures or evidences.
What you get
The same four levels of reading
01
Everything in the Direct Operations scope
Map, per-site tables, four deliverable levels, annexes A to I.
02
Upstream and downstream tables
Supplier risk by location, criticality and spend; products and customers by transition exposure; the value chain stage carried on every row.
03
EUDR due diligence pack
Materials mapped to HS codes and volumes, plot geolocation collected, due diligence statements, mitigation where risk is not negligible, contract clauses and the annual report.
04
Customer requirement matrix
What each large account asks of you — emissions disclosure, low-carbon electricity targets, supplier code of conduct — and where you already answer it.
What it answers
What it answers
- CSRD / ESRS — E1-E4 value chain datapoints, upstream and downstream
- CSDDD — risk-based due diligence across the chain of activities
- EUDR — plot geolocation, legality, due diligence statements, annual report
- CDP — supply chain module, 3.1.1 supply chain response, 5.11 value chain engagement
- EcoVadis — Sustainable procurement
- ISO 20400 — sustainable procurement, §7
- SBTi and SBTi FLAG — scope 3 and land-related targets
- Large-account supplier programmes, including Microsoft supplier requirements
Pricing on request, set with you once the number of sites and materials is known.
How it grafts on
This is a system, not a report. It grafts onto what you already run: the site goes into the insurance programme, the exposure into the business plan, the mitigation into the ISO 14001 improvement programme, the figures into CDP and the ESRS, and the decision into the committee that was going to meet anyway. One assessment, one set of figures, every function reading its own line of it — that is the link it exists to create.
Going further
Risk Assessment — Overall
Add your competitors: public reports, CDP and EcoVadis scores, verified SBTi targets and published commitments, each kept with its evidence quote. It tells you where you stand before a customer does.
Risk Assessment — Value Chain
Tell us where you stand and what deadline you face. A consultant will reply to you personally.
Deliverables can be translated into your language. Debrief sessions are held in English or French.