Home / Risk Assessment

Risk Assessment — Value Chain

Direct operations plus upstream and downstream. Suppliers and subcontractors are scored on their own locations rather than on a questionnaire, EUDR materials are traced to the plot, and the requirements your customers push down the chain are carried into the same plan.

In scope

The three stages, in the words CDP and the ESRS use

Rating agencies and regulators no longer accept an assessment that stops at the factory gate. Every risk we score carries the value chain stage where it happens.

  • Direct operations — everything in the Direct Operations scope, unchanged
  • Upstream — suppliers and subcontractors scored on their own sites, weighted by criticality, annual spend and single-sourcing
  • Upstream — EUDR materials traced: plot geolocation, legality, due diligence statements, deforestation risk by country of origin
  • Downstream — products and customers exposed to transition risk and to buyer requirements, including the supplier programmes of large accounts
  • Downstream — transport, distribution and end of life where they carry the exposure
  • Supplier actions costed and scheduled like your own: questionnaires, dual sourcing, contract clauses, adaptation co-investment at the single-source supplier

How it runs

Four steps, and a consultant at the end of each one

  1. Direct operations first
    The site assessment runs exactly as in the Direct Operations scope. It is the baseline the rest is measured against.
  2. Supplier and product mapping
    Two more structured forms: subcontractors and suppliers, then materials and products. Addresses are geocoded, HS codes and volumes attached, countries of origin resolved.
  3. Upstream and downstream scoring
    Each supplier location is scored on the same eight categories. Criticality, spend and single-sourcing set the weight it carries in your own exposure.
  4. One consolidated plan
    Site actions and supplier actions land in the same action plan, with the same budgets, owners and dates — not in a separate procurement annex nobody reads.

Continuity case

A continuity break that starts at your supplier

The same discipline applied upstream, where most continuity breaks actually start — at a supplier you did not score because a questionnaire told you it was fine.

Gamma — Orléans, single-source supplier (demo data)Supplier scored on its own location · critical input · single-sourced · strategic weight carried into your own exposure

The break does not start at your gate. A single-sourced supplier loses its own water allocation or its own site to a flood; its output stops, and two weeks later your line stops with it. A questionnaire would have told you the supplier has a policy. Scoring its actual location tells you the hazard it sits in, and the weighting tells you how much of your exposure travels through it.

ItemValueWhere it comes from
Supplier scoreComputed on the supplier’s own sites, eight categoriesSame engine, same datasets — not a declaration
Weight in your exposureCriticality × annual spend × single-source flagDeclared by you, applied to the supplier’s score
Propagated downtimeSupplier stoppage carried into your own business interruptionSame downtime scale, applied upstream
Contractual exposurePenalties, de-listing, cost of emergency re-sourcingCosted in the action plan, with FOU-02 and FOU-04
InsuranceContingent business interruption — only covered if the supplier is namedThe supplier list with its locations and scores, which is what the policy needs
ESRS2 SBM-3 · E1-9 · S2 · E3-5Upstream value chain, anticipated financial effects, workers in the chain
CDP3.1.1 · 5.11 · supply chain moduleRisk register, value chain engagement, supplier response

Upstream figures are orders of magnitude built from the supplier’s location and your declared spend, not from the supplier’s accounts.

Compliance tables

The compliance tables you actually reuse

Annexes A to I are delivered in Excel, Word, PDF and an HTML explorer. They are the part clients come back to: not the narrative, the tables. Each one is produced from the data the assessment already holds, so nothing is retyped and every cell keeps its source.

AnnexTableWhat is in it
AWorld inventory of labels, certifications, standards, ratings and regulations147 instruments, 19 columns each — issuing body, jurisdictions, thresholds, deadlines, procedure, validity, official source, verification date, confidence and limits
BSchemes by company and siteWhat applies to each entity and each location, split between held and verified, declared, relevant to examine, and recommended — with the justification and the missing data named
CRisks / scenarios / trajectories / schemes matrixEvery risk crossed with the scenario, the trajectory and the instrument it feeds — this is the table that turns an assessment into a questionnaire answer
DVerbatims and documentary evidenceExact excerpts with their source and date; model excerpts and demo texts are labelled as such
EGap analysisRequirement by requirement: evidence available, declared but unverified, planned, or open
FPrioritisation matrixEffect over cost, with a no-regret bonus, so the order of work is argued rather than asserted
GTrajectories, targets and indicatorsThe baseline, the target, the pathway and the indicator that proves it moved
HRegister of sources and assumptionsEvery value with where it came from, when, and what was assumed — the annex auditors open first
IConsolidated action planOne line per action: budget, owner, date, ISO clause, CDP question, residual risk

Applicability is shown as likely and confirmed with you — it is never asserted for every entity. Obligations are kept apart from voluntary schemes, and no certification is said to reduce a risk: the mapping states what the scheme structures or evidences.

What you get

The same four levels of reading

01

Everything in the Direct Operations scope

Map, per-site tables, four deliverable levels, annexes A to I.

02

Upstream and downstream tables

Supplier risk by location, criticality and spend; products and customers by transition exposure; the value chain stage carried on every row.

03

EUDR due diligence pack

Materials mapped to HS codes and volumes, plot geolocation collected, due diligence statements, mitigation where risk is not negligible, contract clauses and the annual report.

04

Customer requirement matrix

What each large account asks of you — emissions disclosure, low-carbon electricity targets, supplier code of conduct — and where you already answer it.

What it answers

What it answers

  • CSRD / ESRS — E1-E4 value chain datapoints, upstream and downstream
  • CSDDD — risk-based due diligence across the chain of activities
  • EUDR — plot geolocation, legality, due diligence statements, annual report
  • CDP — supply chain module, 3.1.1 supply chain response, 5.11 value chain engagement
  • EcoVadis — Sustainable procurement
  • ISO 20400 — sustainable procurement, §7
  • SBTi and SBTi FLAG — scope 3 and land-related targets
  • Large-account supplier programmes, including Microsoft supplier requirements

Pricing on request, set with you once the number of sites and materials is known.

How it grafts on

This is a system, not a report. It grafts onto what you already run: the site goes into the insurance programme, the exposure into the business plan, the mitigation into the ISO 14001 improvement programme, the figures into CDP and the ESRS, and the decision into the committee that was going to meet anyway. One assessment, one set of figures, every function reading its own line of it — that is the link it exists to create.

Going further

Risk Assessment — Overall

Add your competitors: public reports, CDP and EcoVadis scores, verified SBTi targets and published commitments, each kept with its evidence quote. It tells you where you stand before a customer does.

Contact

Risk Assessment — Value Chain

Tell us where you stand and what deadline you face. A consultant will reply to you personally.

contact@sustainexec.com

Deliverables can be translated into your language. Debrief sessions are held in English or French.